Demolition of an existing structure in preparation for the new foundations and floor make up of the new extension.
Trenches excavated after the demo is completed and floor construction will be next in preparation for @braysdownbespokejoinery to carry on
Another site coming to an end this week.
4 new plots in the centre of bath completed for @izeo_construction.
Project all completed on time and in budget, looking forward to see this one when completed.
All works completed up to DPC including, piling
Things coming together at the Beaufort West project in Bath.
Steel in as per the engineers design and bending schedule, all signed off with building control and concreted along with up-stands as required.
Next up external retaining wall and toe to engin