Another project moving nicely this week.
300mm RC slab being poured the end of this week.
Services to the new structure being excavated installed and reinstated.
Next up re slabbing of the existing terrace and a new brick paved driveway. Looking forw
Another site coming to an end this week.
4 new plots in the centre of bath completed for @izeo_construction.
Project all completed on time and in budget, looking forward to see this one when completed.
All works completed up to DPC including, piling
Things coming together at the Beaufort West project in Bath.
Steel in as per the engineers design and bending schedule, all signed off with building control and concreted along with up-stands as required.
Next up external retaining wall and toe to engin